Geotechnical Design › ALiCC

ALiCC – low improvement ratio cement columns under embankments and storage yards

Arching in the embankment or surface treatment, load sharing between cement columns and soil, settlement, differential settlement, column stress and surface treatment checks.

Open the calculator

Calculation method

PWRI Technical Manual of the ALiCC Method (2006): plastic arch angle (Eq. 3.5–3.7, Reference Fig. R1–R4), column stress (Eq. 3.11), composite settlement S = σv·L/Eeq plus S2 below floating tips, differential settlement δs = Ssoil − Scol, Fs = quck/Pcol, surface cement treatment (punching Eq. 3.17, bending) and a spacing study.

About

Free online calculator by My Formulas, a reference for design and education. Enter the inputs, get the results at once, and open the step-by-step calculation (free member account) to check every value. Verify results independently before use.

Related tools