Analysis tools for ground-related structures and improvement.

Retaining wall

Foundation

Tunnels

Ground improvement

Ground stability

Tools on this page

Gravity retaining wall stability to EN 1997-1
Sliding, overturning and bearing checks of a gravity wall, with or without a rubble base. Method: Coulomb earth pressure; EN 1997-1 DA1 (or factors of safety) for sliding, overturning about the toe and bearing (Annex D) with eccentricity.
Shallow footing bearing capacity – EC7 Annex D, Vesić, Hansen, Meyerhof, Terzaghi
Bearing resistance, sliding and eccentricity of pad and strip footings, drained or undrained. Method: Bearing capacity factors with shape, depth and inclination factors (EN 1997-1 Annex D, Vesić, Hansen, Meyerhof or Terzaghi, after Bowles); effective width B′ = B − 2e; EC7 DA1 or factor of safety.
Pile axial capacity and settlement – single pile and pile group
Shaft and base resistance in compression and tension (soil and rock), negative skin friction, group efficiency, axial deflection and group settlement. Method: SPT-N correlations, α / β and Nc / Nq, or rock q_u; EN 1997-1 DA1 with model factor; drag load from negative skin friction; group efficiency for rectangular and triangular layouts; axial deflection by Randolph & Wroth (1978) or Vesić (1977); group settlement by interaction factors.
Beam on elastic (Winkler) foundation
Deflection, bending moment, shear and soil pressure of a beam or strip footing on a Winkler foundation. Method: Euler–Bernoulli beam elements with a consistent Winkler foundation stiffness k = ks·B; optional tensionless foundation solved iteratively.
Embedded retaining wall – cantilever and propped walls
Required embedment, bending moment, shear and strut forces of sheet pile, contiguous pile and diaphragm walls. Method: Cantilever: fixed earth support (simplified Blum, design embedment 1.2·d0). Single prop: free earth support about the prop, with construction stages. Earth pressure EN 1997-1 Annex C, as the ERSS toe-stability check. Cantilever pipe or sheet pile walls also by the PHRI method (Japan's Port and Harbour Research Institute, TSPHJ 2025): virtual seabed, pile head deflection, maximum moment and l_m1.
ERSS stability – toe stability, base heave, piping and uplift
Stability checks of an excavation between embedded walls. Method: Toe stability: moments about the lowest strut with EN 1997-1 Annex C coefficients. Base heave: Terzaghi with an embedded toe. Hydraulic heave and uplift: EN 1997-1 HYD and UPL on a Terzaghi prism. DCM and bored piles optional.
Soil nail wall – BS 8006-2 and FHWA GEC 7
Global stability with nails, sliding and facing head load of a soil nail wall. Method: Bishop's simplified method on circular slip surfaces with nail forces T = min(tension, pull-out behind, facing + pull-out in front). BS 8006-2 with EN 1997-1 DA1-C2 partial factors, or FHWA GEC 7 (FHWA-NHI-14-007) allowable stress design.
Reinforced soil wall – geosynthetic, BS 8006-1
External and internal stability of a geosynthetic reinforced soil wall. Method: BS 8006-1:2010+A1:2016 tie-back wedge method; sliding, bearing and eccentricity; rupture and pull-out of each layer with combinations A, B and C.
Consolidation settlement and PVD design
Primary consolidation settlement against time of a layered profile, with prefabricated vertical drains and reclamation fill. Method: One-dimensional consolidation (Cc, Cr, OCR) solved by finite differences in time; radial drainage to PVDs by Hansbo (1981) with smear and well resistance.
Stone columns – Priebe settlement improvement
Settlement with and without stone columns on a triangular or rectangular grid, bulging capacity and consolidation time. Method: Priebe (1995): basic improvement factor n0, column compressibility, depth factor fd and compatibility limits, sublayers of 0.5 m; bulging by Hughes & Withers (1974); consolidation by Hansbo with Han & Ye (2001).
ALiCC – low improvement ratio cement columns under embankments and storage yards
Arching in the embankment or surface treatment, load sharing between cement columns and soil, settlement, differential settlement, column stress and surface treatment checks. Method: PWRI Technical Manual of the ALiCC Method (2006): plastic arch angle (Eq. 3.5–3.7, Reference Fig. R1–R4), column stress (Eq. 3.11), composite settlement S = σv·L/Eeq plus S2 below floating tips, differential settlement δs = Ssoil − Scol, Fs = quck/Pcol, surface cement treatment (punching Eq. 3.17, bending) and a spacing study.
Sand compaction pile – settlement and strength
Settlement reduction, rate of consolidation and composite strength of SCP-improved clay. Method: Japanese design method (OCDI; Aboshi et al. 1979): stress concentration ratio, settlement reduction β = μc, Hansbo radial drainage, composite shear strength.
Deep soil mixing columns
Settlement, column stress and capacity of DSM columns. Method: Equal-strain stress sharing and composite modulus; column material strength from qu with a field/lab factor; geotechnical capacity after Broms (1999).
Slope stability – Bishop simplified
Critical circular slip surface and factor of safety of a layered slope. Method: Bishop's simplified method on circular slip surfaces with an automatic grid search; drained or undrained layers; factor of safety or EN 1997-1 DA1-C2.
Cut-and-cover box tunnel
Bending moments and forces in a single-cell box under earth and water pressure. Method: Closed frame on the member centrelines on Winkler springs or a uniform base pressure; load cases with at-rest and active pressure; ULS and SLS.
Bored tunnel segmental lining – design forces, segment, joints and rebar ratio
Design forces in a segmental tunnel lining for four load cases, RC or SFRC segment capacity and crack width, radial and circumferential joint checks and the steel–concrete ratio. Method: Muir Wood (1975) continuum model modified by Curtis (1976) for the lining forces in four load combinations (lowest groundwater, groundwater at ground level, flood level, future distortion after Morgan); segment design to EN 1992-1-1 (RC) or, for SFRC, fib Model Code 2020, SS 674:2021 or fib MC2010; radial and circumferential joint bursting (strut-and-tie, EN 1992-1-1 6.5.3) and bearing (6.7), with fibres per the selected code; rebar quantity per ring. Work through the four tabs in order.
Mined tunnel – convergence–confinement
Ground reaction curve, support characteristic and equilibrium of a circular tunnel. Method: Convergence–confinement method: Mohr–Coulomb ground reaction (Duncan Fama 1993), longitudinal profile (Vlachopoulos & Diederichs 2009), shotcrete and bolt support curves.